When I arrived at the ministry center this morning at 9 a.m. after taking a load of metal duct work to the dump to be recycled, there were 3 vans from Eastern Shore Refrigeration and 1 Replogle Construction van. In addition to Jim, there were 6 guys from Eastern Shore Refrigeration and then a short while later, Chris Gilbert and his helper J.D. showed up. Needless to say the sanctuary was a busy place.
By the day's end, the HVAC guys had the system set and half of the duct work hung. And Chris is working hard at completing the upstairs electrical rough in. Jim and I did what we needed to and left. We will be back tomorrow afternoon and evening to frame the wall behind the stage in order to accommodate the electric and drywall.
These indeed are exciting days!